Our teams installed an emergency generator in a rehabilitation center in the North.
Endurance tests were carried out after on-site acceptance with load tests on resistive load banks up to 110% of the rated power.
We took measurements of the electrical and physical parameters of the generator.
With the client, we validated the test protocol.